Timeline and key stages of the outage
The Spanish government report identifies three phases of the crisis:
- Phase 1 (12:00–12:30) – Atypical frequency fluctuations (0.6 Hz and 0.2 Hz) led to an increase in voltage. The operator applied standard measures, but they only partially stabilized the system.
- Phase 2 (12:32–12:33) – A sharp increase in voltage caused massive generation outages in Granada, Badajoz, Seville and other regions.
- Phase 3 (12:33–12:33:30) – Cascading outages due to overvoltage, loss of synchronization with France and a complete collapse of the Iberian Peninsula power system.
Main causes of the accident
The report points to the multifactorial nature of the incident:
Insufficient voltage control
- Lack of synchronous generators regulating voltage (their number on April 28 was the lowest since the beginning of the year).
- Incorrect operation of some stations that should have stabilized the voltage, but instead exacerbated the problem (for example, by generating reactive power).
Ineffectiveness of protection mechanisms
- Automatic load shedding did not work optimally, reducing consumption and further increasing voltage.
- Some generators disconnected before the permissible limits (before reaching 380-435 kV), which accelerated the cascading collapse.
Lack of flexibility in the system
- Solar and wind power plants (asynchronous sources) could have helped, but Spanish regulations do not allow them to participate in voltage regulation.
- Lack of energy storage (in 2024, Spain introduced only 250 MWh, which is extremely low for such an energy system).
Restoration of power supply
- International connections (France, Morocco) and hydroelectric power plants (Duro basin) played a key role.
- By 22:00, 50% of consumption was restored, by 7:00 on April 29 – 99.95%.
Recommendations for preventing such accidents
- Strengthening control over the fulfillment of obligations by market participants.
- Involvement of renewable energy sources in voltage management (e.g. through solar power plant inverters).
- Development of energy storage and increasing the flexibility of the system.
- Review of protective mechanisms (so that outages do not aggravate the accident).
Response of SolarPower Europe
The association emphasizes: “Solar energy is not to blame.” – Photovoltaic plants are technically capable of regulating voltage, but Spanish regulations prohibit this.
- Investments in smart inverters and storage are needed.
Conclusion
The accident of April 28, 2025 in Spain is the result of systemic problems, not a single failure. Key lessons:
- Voltage regulation requires more resources (synchronous generators or RES adaptation).
- Protection systems must be reviewed to avoid aggravating the crisis.
- Spain needs to actively implement storage and flexible solutions for the stability of the power system.
This case can become a precedent for other countries, especially with a high share of renewable energy.